Thien Thai Hotel and Tourism Joint Stock Company Furama Villas Wastewater Treatment System

Objective: The wastewater treatment system at Furama Villas is deployed to ensure effective wastewater treatment, maintain a clean environment, and improve service quality and customer experience.

Capacity: 250 m³/day.night

Target audience:

  • Tourists and guests staying at Furama Villas.
  • Residential community and the surrounding environment of the villa area.

Outstanding features:

  • Advanced technology: The system uses modern wastewater treatment technology, ensuring effective removal of pollutants and harmful bacteria.
  • Aesthetic design: The system is designed in harmony with the surrounding landscape, without affecting the beauty of the resort.
  • Smart operation: Highly automated system, monitors and adjusts the treatment process accurately and effectively.

Benefits Benefits:

  • Environmental protection: Minimize water pollution, protect ecosystems and maintain a clean living environment.
  • Improve service quality: Ensure a clean and safe environment for customers, enhance the resort experience at Furama Villas.
  • Comply with regulations: Ensure the resort complies with environmental and safety regulations.

Implementation steps:

  1. Survey and design: Assess the current status and design a system suitable for the treatment needs of the villa area.
  2. Installation and implementation: Construction and installation of wastewater treatment equipment and systems.
  3. Trial operation: Check and adjust the system to ensure ensure stable operation.
  4. Transfer and training: Instructions on system operation and maintenance for villa management staff.

Expected results:

  • Wastewater after treatment meets standards: Wastewater after going through the treatment system meets environmental standards.
  • Improved living environment: Minimize pollution risks, improve the quality of the living environment around the villa.
  • Customer experience: Bring a fresh and safe resort space to customers.

Implementation time: The project is expected to be completed within 6 months, from the survey stage until the system is operating stably.

Leave a Reply

Your email address will not be published. Required fields are marked *