Objective: The project to renovate and upgrade the domestic wastewater treatment system at VSIP Quang Ngai Industrial Park aims to meet the increasing demand for wastewater treatment, ensure compliance with strict environmental standards and protect public health.
Capacity: 200 m³/day.night
Target audience:
- Enterprises and production facilities in VSIP Quang Ngai Industrial Park.
- Workers and residents around the area.
Outstanding features:
- Advanced technology: The system is upgraded using modern wastewater treatment technology, increasing the efficiency of removing pollutants.
- Optimal design: The system is designed to optimize space and efficiency, easy to maintain and operate.
- Efficient operation: The system operates automatically, minimizing human intervention and ensuring stability and continuity.
Benefits Benefits:
- Environmental protection: Improve the quality of wastewater treatment, reduce water pollution and protect the ecosystem.
- Improve the quality of life: Ensure a clean and safe living environment for workers and surrounding residents.
- Comply with regulations: Ensure that businesses in the industrial park comply with environmental and safety regulations.
Implementation steps:
- Survey and design: Assess the current status and design a system upgrade solution suitable for wastewater treatment needs.
- Installation and implementation: Construct and upgrade wastewater treatment equipment and systems.
- Trial operation: Check and adjust the system to ensure stable operation after upgrading.
- Transfer and training: Instructions on operation and maintenance of the upgraded system for industrial park employees.
Expected results:
- Wastewater after treatment meets standards: Wastewater after going through the upgraded system meets environmental standards.
- Improved living environment: Reduce pollution risks, improve the quality of the living environment around the industrial park.
- Increased system efficiency: The system operates more efficiently, meeting the increasing demand for wastewater treatment.
Implementation time: The project is expected to be completed within 6 months, from the survey stage until the upgraded system operates stably.