Phuc Long Tourism Investment & Service Company Limited Branch Renovates and Installs Wastewater Treatment System for Grand Gold Hotel

Objective: Project to renovate and install a wastewater treatment system for Grand Gold Hotel to improve wastewater treatment efficiency, ensure compliance with environmental standards and bring the best experience to customers.

Capacity: 100 m³/day.night

Target audience:

  • Tourists and guests staying at Grand Gold Hotel.
  • Residential community and environment surrounding the hotel area.

Outstanding features:

  • Advanced technology: The system uses modern wastewater treatment technology, ensuring effective removal of pollutants and harmful bacteria.
  • Compact design: The system is compactly designed, space-optimized and easy to maintain.
  • Automatic operation: The system is highly automated, monitors and adjusts the treatment process accurately and efficiently.

Benefits Benefits:

  • Environmental protection: Minimize water pollution, protect ecosystems and maintain a clean living environment.
  • Improve service quality: Ensure a clean and safe environment for customers, enhance the hotel’s resort experience.
  • Comply with regulations: Ensure the hotel complies with environmental and safety regulations.

Implementation steps:

  1. Survey and design: Assess the current status and design the system to suit the hotel’s treatment needs.
  2. Installation and implementation: Construction and installation of wastewater treatment equipment and systems.
  3. Trial operation: Check and adjust the system to ensure stable operation determined.
  4. Transfer and training: Instructions for operating and maintaining the system for hotel staff.

Expected results:

  • Wastewater after treatment meets standards: Wastewater after going through the treatment system meets environmental standards.
  • Improved living environment: Minimize pollution risks, improve the quality of the living environment around the hotel.
  • Customer experience: Bring a fresh and safe resort space to customers.

Implementation time: The project is expected to be completed within 4 months, from the survey stage until the system is operating stably.

Leave a Reply

Your email address will not be published. Required fields are marked *