The project to construct a wastewater treatment plant in An Phu residential area is designed to ensure effective wastewater treatment, meeting the needs of the residential community, while complying with current environmental regulations. Target audience:
- Residents living in An Phu residential area.
- Residents and the surrounding environment of the project area.
Outstanding features:
- Advanced technology: The wastewater treatment plant uses modern technology, ensuring high efficiency in removing pollutants and protecting the environment.
- Flexible design: The system is flexibly designed, easy to integrate and expand in the future when demand increases.
- Stable operation: The system is highly automated, ensuring continuous, stable and energy-saving operation.
Benefits:
- Environmental protection: Minimizing source pollution water, protect the ecosystem and public health.
- Improve quality of life: Ensure a clean, healthy living environment for residents of An Phu residential area.
- Comply with regulations: Ensure that the residential area complies with environmental and safety regulations.
Implementation steps:
- Survey and design: Assess the current status and design a wastewater treatment plant suitable for the needs of the residential area.
- Installation and implementation: Construction and installation of wastewater treatment equipment and systems.
- Trial operation: Check and adjust the system to ensure stable operation.
- Transfer and training: Provide instructions on system operation and maintenance for employees residential area management.
Expected results:
- Wastewater after treatment meets standards: Wastewater after passing through the treatment plant meets environmental standards.
- Improved living environment: Minimizing pollution risks, improving the quality of the living environment around the residential area.
- Satisfied community: Bringing a clean and safe living environment to residents of An Phu residential area.
Implementation time: The project is expected to be completed within 8 months, from the survey stage until the treatment plant is operating stably.